Duct Work (Winter 2005) 

November 16 - We are currently working on finishing up the duct work and a few other small things before we can begin insulation and sheet rock.
FRAME
FRAME
FRAME
FRAME
Peggy working on electrical.
FRAME
FRAME
FRAME
FRAME
FRAME
FRAME
FRAME
FRAME
Notice the blocking along the ceiling line.
FRAME
FRAME
FRAME
FRAME
FRAME
FRAME
FRAME
FRAME
No Caption
FRAME
FRAME
FRAME
FRAME
Peggy working on electrical.
Viewed: 539 times.
Notice the blocking along the ceiling line.
Viewed: 528 times.
Viewed: 517 times.
FRAME
FRAME
FRAME
FRAME
No Caption
FRAME
FRAME
FRAME
FRAME
FRAME
FRAME
FRAME
FRAME
No Caption
FRAME
FRAME
FRAME
FRAME
FRAME
FRAME
FRAME
FRAME
Dinner time.
FRAME
FRAME
FRAME
FRAME
Viewed: 509 times.
Viewed: 551 times.
Dinner time.
Viewed: 552 times.
FRAME
FRAME
FRAME
FRAME
Don and Kathy working on bending some sheet metal for the duct work.
FRAME
FRAME
FRAME
FRAME
FRAME
FRAME
FRAME
FRAME
Duane and others putting sheet rock on part of the ceiling.
FRAME
FRAME
FRAME
FRAME
FRAME
FRAME
FRAME
FRAME
Charlie putting the last screws into the steel studs.
FRAME
FRAME
FRAME
FRAME
Don and Kathy working on bending some sheet metal for the duct work.
Viewed: 527 times.
Duane and others putting sheet rock on part of the ceiling.
Viewed: 505 times.
Charlie putting the last screws into the steel studs.
Viewed: 514 times.
Powered by Gallery v1.4.4-pl2                        Back to the Clover Valley Community Church Web Site RSS