Duct Work (Winter 2005) 

November 16 - We are currently working on finishing up the duct work and a few other small things before we can begin insulation and sheet rock.
FRAME
FRAME
FRAME
FRAME
Peggy working on electrical.
FRAME
FRAME
FRAME
FRAME
FRAME
FRAME
FRAME
FRAME
Notice the blocking along the ceiling line.
FRAME
FRAME
FRAME
FRAME
FRAME
FRAME
FRAME
FRAME
No Caption
FRAME
FRAME
FRAME
FRAME
Peggy working on electrical.
Viewed: 589 times.
Notice the blocking along the ceiling line.
Viewed: 572 times.
Viewed: 560 times.
FRAME
FRAME
FRAME
FRAME
No Caption
FRAME
FRAME
FRAME
FRAME
FRAME
FRAME
FRAME
FRAME
No Caption
FRAME
FRAME
FRAME
FRAME
FRAME
FRAME
FRAME
FRAME
Dinner time.
FRAME
FRAME
FRAME
FRAME
Viewed: 552 times.
Viewed: 592 times.
Dinner time.
Viewed: 596 times.
FRAME
FRAME
FRAME
FRAME
Don and Kathy working on bending some sheet metal for the duct work.
FRAME
FRAME
FRAME
FRAME
FRAME
FRAME
FRAME
FRAME
Duane and others putting sheet rock on part of the ceiling.
FRAME
FRAME
FRAME
FRAME
FRAME
FRAME
FRAME
FRAME
Charlie putting the last screws into the steel studs.
FRAME
FRAME
FRAME
FRAME
Don and Kathy working on bending some sheet metal for the duct work.
Viewed: 565 times.
Duane and others putting sheet rock on part of the ceiling.
Viewed: 550 times.
Charlie putting the last screws into the steel studs.
Viewed: 557 times.
Powered by Gallery v1.4.4-pl2                        Back to the Clover Valley Community Church Web Site RSS