New Building Interior Framing (Spring 2002) 
FRAME
FRAME
FRAME
FRAME
Christina cutting a steel stud.
FRAME
FRAME
FRAME
FRAME
FRAME
FRAME
FRAME
FRAME
Charlie jackhammering some holes for plumbing.
FRAME
FRAME
FRAME
FRAME
FRAME
FRAME
FRAME
FRAME
Christina putting together door headers.
FRAME
FRAME
FRAME
FRAME
Christina cutting a steel stud.
Viewed: 1074 times.
Charlie jackhammering some holes for plumbing.
Viewed: 938 times.
Christina putting together door headers.
Viewed: 1031 times.
FRAME
FRAME
FRAME
FRAME
Ken and Mike planning.
FRAME
FRAME
FRAME
FRAME
FRAME
FRAME
FRAME
FRAME
Ken looking over the plans.
FRAME
FRAME
FRAME
FRAME
FRAME
FRAME
FRAME
FRAME
Matthew drilling into concrete.
FRAME
FRAME
FRAME
FRAME
Ken and Mike planning.
Viewed: 947 times.
Ken looking over the plans.
Viewed: 870 times.
Matthew drilling into concrete.
Viewed: 949 times.
FRAME
FRAME
FRAME
FRAME
Mike sawing steel studs.
FRAME
FRAME
FRAME
FRAME
FRAME
FRAME
FRAME
FRAME
Pastor Frank jackhammering some holes for plumbing.
FRAME
FRAME
FRAME
FRAME
FRAME
FRAME
FRAME
FRAME
Suzanne and Ken putting a wall together.,
FRAME
FRAME
FRAME
FRAME
Mike sawing steel studs.
Viewed: 960 times.
Pastor Frank jackhammering some holes for plumbing.
Viewed: 971 times.
Suzanne and Ken putting a wall together.,
Viewed: 945 times.
Powered by Gallery v1.4.4-pl2                        Back to the Clover Valley Community Church Web Site RSS