New Building Interior Framing (Spring 2002) 
FRAME
FRAME
FRAME
FRAME
Christina cutting a steel stud.
FRAME
FRAME
FRAME
FRAME
FRAME
FRAME
FRAME
FRAME
Charlie jackhammering some holes for plumbing.
FRAME
FRAME
FRAME
FRAME
FRAME
FRAME
FRAME
FRAME
Christina putting together door headers.
FRAME
FRAME
FRAME
FRAME
Christina cutting a steel stud.
Viewed: 683 times.
Charlie jackhammering some holes for plumbing.
Viewed: 530 times.
Christina putting together door headers.
Viewed: 602 times.
FRAME
FRAME
FRAME
FRAME
Ken and Mike planning.
FRAME
FRAME
FRAME
FRAME
FRAME
FRAME
FRAME
FRAME
Ken looking over the plans.
FRAME
FRAME
FRAME
FRAME
FRAME
FRAME
FRAME
FRAME
Matthew drilling into concrete.
FRAME
FRAME
FRAME
FRAME
Ken and Mike planning.
Viewed: 547 times.
Ken looking over the plans.
Viewed: 491 times.
Matthew drilling into concrete.
Viewed: 554 times.
FRAME
FRAME
FRAME
FRAME
Mike sawing steel studs.
FRAME
FRAME
FRAME
FRAME
FRAME
FRAME
FRAME
FRAME
Pastor Frank jackhammering some holes for plumbing.
FRAME
FRAME
FRAME
FRAME
FRAME
FRAME
FRAME
FRAME
Suzanne and Ken putting a wall together.,
FRAME
FRAME
FRAME
FRAME
Mike sawing steel studs.
Viewed: 562 times.
Pastor Frank jackhammering some holes for plumbing.
Viewed: 576 times.
Suzanne and Ken putting a wall together.,
Viewed: 580 times.
Powered by Gallery v1.4.4-pl2                        Back to the Clover Valley Community Church Web Site RSS