Interior Framing (Winter 2005) 

FRAME
FRAME
FRAME
FRAME
Preparing to anchor the wall to the ceiling from the scissor lift.
FRAME
FRAME
FRAME
FRAME
FRAME
FRAME
FRAME
FRAME
Extending the rafters over the kitchen to overhang the pass-through window by two feet.
FRAME
FRAME
FRAME
FRAME
FRAME
FRAME
FRAME
FRAME
Anchoring the wall to the ceiling.
FRAME
FRAME
FRAME
FRAME
Preparing to anchor the wall to the ceiling from the scissor lift.
Viewed: 726 times.
Extending the rafters over the kitchen to overhang the pass-through window by two feet.
Viewed: 759 times.
Anchoring the wall to the ceiling.
Viewed: 699 times.
FRAME
FRAME
FRAME
FRAME
Cody finishing up a wall.
FRAME
FRAME
FRAME
FRAME
FRAME
FRAME
FRAME
FRAME
Charlie and Pastor Frank cutting plywood for the roof over the kitchen.
FRAME
FRAME
FRAME
FRAME
FRAME
FRAME
FRAME
FRAME
Jennica climbing down to get a pencil that was dropped.
FRAME
FRAME
FRAME
FRAME
Cody finishing up a wall.
Viewed: 714 times.
Charlie and Pastor Frank cutting plywood for the roof over the kitchen.
Viewed: 726 times.
Jennica climbing down to get a pencil that was dropped.
Viewed: 865 times.
FRAME
FRAME
FRAME
FRAME
Matthew screwing the plywood down above the kitchen.
FRAME
FRAME
FRAME
FRAME
FRAME
FRAME
FRAME
FRAME
The ground crew cutting blocks for blocking the walls.
FRAME
FRAME
FRAME
FRAME
FRAME
FRAME
FRAME
FRAME
Marcus and Tracy working on connecting the wall to the roof of the building.
FRAME
FRAME
FRAME
FRAME
Matthew screwing the plywood down above the kitchen.
Viewed: 683 times.
The ground crew cutting blocks for blocking the walls.
Viewed: 685 times.
Marcus and Tracy working on connecting the wall to the roof of the building.
Viewed: 676 times.
Powered by Gallery v1.4.4-pl2                        Back to the Clover Valley Community Church Web Site RSS