Interior Framing (Winter 2005)  

FRAME
FRAME
FRAME
FRAME
Marcus and Tracy working on connecting the wall to the roof of the building.
FRAME
FRAME
FRAME
FRAME

Marcus and Tracy working on connecting the wall to the roof of the building.


Powered by Gallery v1.4.4-pl2                        Back to the Clover Valley Community Church Web Site RSS