Stage (Spring 2005) 

FRAME
FRAME
FRAME
FRAME
Tracy, Roy, and Charlie laying out the stage.
FRAME
FRAME
FRAME
FRAME
FRAME
FRAME
FRAME
FRAME
Setting the first joist level.
FRAME
FRAME
FRAME
FRAME
FRAME
FRAME
FRAME
FRAME
Anchoring the first joist.
FRAME
FRAME
FRAME
FRAME
Tracy, Roy, and Charlie laying out the stage.
Viewed: 925 times.
Setting the first joist level.
Viewed: 730 times.
Anchoring the first joist.
Viewed: 642 times.
FRAME
FRAME
FRAME
FRAME
Wow, this is going to be a big stage.
FRAME
FRAME
FRAME
FRAME
FRAME
FRAME
FRAME
FRAME
Dan and Cody putting joists in place.
FRAME
FRAME
FRAME
FRAME
FRAME
FRAME
FRAME
FRAME
Charlie and Ken setting the joists level with each other.
FRAME
FRAME
FRAME
FRAME
Wow, this is going to be a big stage.
Viewed: 759 times.
Dan and Cody putting joists in place.
Viewed: 681 times.
Charlie and Ken setting the joists level with each other.
Viewed: 664 times.
FRAME
FRAME
FRAME
FRAME
More leveling.
FRAME
FRAME
FRAME
FRAME
FRAME
FRAME
FRAME
FRAME
Cody anchoring the pressure treated base to the concrete.
FRAME
FRAME
FRAME
FRAME
FRAME
FRAME
FRAME
FRAME
Weighting down a high spot.
FRAME
FRAME
FRAME
FRAME
More leveling.
Viewed: 700 times.
Cody anchoring the pressure treated base to the concrete.
Viewed: 766 times.
Weighting down a high spot.
Viewed: 689 times.
Powered by Gallery v1.4.4-pl2                        Back to the Clover Valley Community Church Web Site RSS